My Experience
I enjoy working with customers to create Material Handling Solutions to their needs and solving problems and needs within their facility and operation. With over 39 years of combined factory and field experience in creating conceptual layouts, engineering specials, project management, doing the conveying and automated equipment application engineering, quoting, selling and implementing Automated Material Handling Systems for a vast number of industries and applications.
Working at Bastian
Having a full offering of automated material handling products, services and solutions, to offer and provide our customers with "state-of-the-art- technology"
Why do customers come back to me?
Having over 39 years of experience in a vast number of diversified industries, being able to help solve their material handling and conveying needs. Being able to quickly conceptualize designs in plan view and 3-D and coming up with workable solutions. Always trying to keep our solutions simple, think out side the box, be cost effective and making sure the right equipment is correct for their application, and deliver what you promised. Being dedicated to them, and doing whatever it takes to implement their systems and service them after installation.
A little bit about myself
Sales Engineering Manager at Hytrol Conveyor Company for 5 years, then moved to California in 1975 as a Field-Sales Engineer. Married to my wonderful wife and best friend, Karen for 43 years, have (3) great children, Craig, Stacey and Steve, and have (3) wonderful grandson's Cristian, Drake and Ryder who we enjoy very much. Enjoy most sports, football, baseball, softball, soccer, snow-skiing, the beach, and love golf but can't find time to play as much as I would like, as my grandson's sports and being with them comes first. Enjoy familiy vacations and outings to the sand dunes with the dune buggy and quad's. Being with friends, doing service projects, and doing my church callings.
Project work I am most proud of
Conceptually designed, engineered, sold, Project Managed, and implemented a complete PC kitting, Configuration of Hard-Drives, PC assembly, (18) Lane x 3-Level Burn-In Testing of 7,200 units at a time with automated infeed and discharge, software testing, packing and shipping conveying system for the largest PC computer assembly plant in the world. This PC assembly plant was producing between 22,000-24,000 computers per day.
Detailed Projects
Additional Projects