Shopping Cart

Items

  • Your basket is currently empty
 

Choose Location

Close Panel

Astra-CFX Material Handling Case Study

 

Business Challenges

  • Implement a facility to provide one assembly every 15-20 seconds Just in Sequence (JIS) to BMW
  • Minimize floor space used and amount of purchased parts managed to reduce operating costs
  • Quick cycle times to minimize labor hours
  • High yields to reduce scrap

 

Results

  • Produced over 200 assemblies/hour
  • Shipped full trailer assemblies every 2-4 hours
  • Never sent a set of assemblies out of sequence

 


Contact Us


1-800-772-0464

Request A Quote

Email Bastian

Live Chat

Download Catalog

Newsletter Sign Up
Sign Up for the Bastian Material Handling Newsletter