Shopping Cart
Items
- Your basket is currently empty
Item Added to Cart
Starbucks - Washington Material Handling Case Study
Key Technologies
- Garvens high speed scale
- Accusort Omni directional scanners
- Hytrol ART Belt to singulate and center product for sorter
- Hytrol ProSort 400 Shoe Sorter
Business Challenges
- Starbucks previously had an outdated conveyor system with little automation
for their picking operations
- They needed to increase throughput and reduce high labor costs
- Install the system without disrupting ongoing operations
Results
- The design throughput rate of 94 Cartons per Minute was achieved. BMH’s system actually
allowed for 100 Cartons per Minute, exceeding the customer's expectations
- Staffing levels were reduced by approximately 20%, and the Company was able to cut back on overtime
- The Company was able to maintain operations during the transition and fulfill orders to retail stores
across the country
Multi-Media
Videos
Photos