Shopping Cart

Items

  • Your basket is currently empty
 

Choose Location

Close Panel

Virginia Department of Alcoholic Beverage Control Material Handling Case Study

 

Key Technologies

  • Three 2-level pick modules for full case picking
  • Shoe Sorter at 450 ft/min and 100 cartons per minute throughput
  • Eight after sort accumulating decline spirals
  • Ergonomically designed de-palletization area for high volume movers

Business Challenges

  • Unprecedented growth in retail stores; difficult to meet customer demands
  • SKU's carried grew from 2,200 to over 3,500
  • Warehouse space was running low
  • Current facility had no automation

Results

  • BMH design helped VA ABC maintain a single shift operation and fulfill all orders during a 5-day work week. Up to 20,000 cases could be shipped in an 8-hour day
  • VA ABC has maintained 97% of the items in stock in their retail stores and is now setting its goal at a 98% "in stock" rate for all SKUs
  • Improved order accuracy for retail store deliveries
  • New ergonomic design has measurably improved worker conditions

Contact Us


1-800-772-0464

Request A Quote

Email Bastian

Live Chat

Download Catalog

Newsletter Sign Up