Case Study: Central Power Systems
System Summary
Central Power Systems distributes small engine service parts and outdoor power equipment through a network of 6000 registered service dealers in several states throughout the United States and the Bahamas.
Business Challenge
- BMH integrated a small system for Central Power Systems (CPS) in 1999.
- CPS asked Bastian to help plan their move into a new, larger Distribution Center in Columbus, Ohio.
- BMH was charged with designing a system that would allow for future growth
Key Technologies
- Hytrol conveyor, V Belt, and O-ring transfers
- ASAP Automated Order Routing (WCS), Batch Pick List/Labels), Host Interface to existing WMS
- ASAP Pick-To-Light Technology
- Unarco Carton Flow
- BMH Controls (WCS)
- Interlake Pallet Rack
- Accusort Scanners
Results
- BMH successfully delivered the project on-time and within budget despite a very tight schedule.
- BMH provided CPS with a slotting analysis for more efficient picking
- BMH’s relocation services allowed for a successful transfer of existing equipment from CPS’s Alabama and Ohio facilities to the new Distribution Center.
- CPS is well positioned to meet their future growth goals.





