Stage 2: Current System Assessment
- Stage 1: Project Initialization
- Stage Stage 2: Current System Assessment
- Stage 3: Database Development
- Stage 4: Profiles Generation
- Stage 5: System Concepting
- Stage 6: Recommended System Model
- Stage 7: Feasibility Study
- Stage 8: Final Report
Stage 2: Current System Assessment
In this early stage we need to learn your business and where it’s going.
We conduct several facility walk-throughs, perform various activities as operators,
and study your current business practices.
- Facility layout – Bastian will develop accurate, as is, drawings of your current facility. Specific focus will be given to the interface between construction and facility operations.
- Management and operator interviews – Bastian will identify relevant strategic and operational issues that will potentially impact the process of the System Configuration Analysis and the final recommendations.
- Document information flow – Bastian will document the information systems environment within the operation. Specific emphasis is placed on processing steps that require paper documents or interface with information systems.
- Compile results – Bastian will summarize the results of all the previous engineering studies and present a detailed schedule for the remainder of the System Configuration Analysis.



